Full cycle of work on installing a solar power station
Installation of power transmission lines
Installation of metal structures and power station
Assistance in connecting the station to the factory's energy system
Support in obtaining all licenses and permits
Delivery of all components
01
We conduct a meeting with an inspection and drone survey of the sites where the station installation is planned, gathering information on electricity consumption and tariff.
Site inspection and determining needs
HOW WE WORK:
02
A document with a 3D model of the station, calculated power, list of manufacturers and components, as well as the bank as a creditor.
Preparing the project and commercial proposal
03
Signing a service agreement
Contract signing
04
Submitting an application to the bank with accompanying pricing proposal
Bank application
05
Performing a complex of works on station construction, monitoring connection*. After completion, signing the acceptance certificate
Building and setting up the station
06
We recommend a service for station maintenance – cleaning and inspection of the station 2-4 times a year depending on weather conditions
Support and maintenance
07
We provide warranty support for 20 years
20-year warranty
we recommend
Monitoring system
* Monitoring is an application that allows tracking key performance indicators of the station. It is installed on the device of the station owner, ECOECO has access to monitoring and will respond to performance drops even without a request from the client.
economics of a solar power station
01
Contract signing
Making a 20-25% prepayment
Station construction
From 2 to 24 weeks
02
Start of operation
Loan payments
Payback period 3-5 years
03
Operation
Cost savings
20-year warranty
Cost savings
let's contact
Take the first step towards your own solar power plant
economy calculator
Choose the savings calculation option and enter the necessary data. We will then calculate the savings for you.